<

GUNGNIR RESOURCES INC. (:GUG) Gungnir Resources Inc.: Gungnir Drills 6.67% Nickel Within 5.65 metres Grading 2.62% Nickel

Transparency directive : regulatory news

21/09/2021 12:00

DGAP-News: Gungnir Resources Inc. / Key word(s): Drilling Result
Gungnir Resources Inc.: Gungnir Drills 6.67% Nickel Within 5.65 metres Grading 2.62% Nickel

21.09.2021 / 12:00
The issuer is solely responsible for the content of this announcement.


Gungnir Drills 6.67% Nickel Within 5.65 metres Grading 2.62% Nickel
SURREY, BC / ACCESSWIRE / September 21, 2021 / Gungnir Resources Inc. (TSXV:GUG)(OTC PINK:ASWRF) ("Gungnir" or the "Company") is very pleased to report additional high-grade nickel results from continuing drilling at the Company's Lappvattnet nickel deposit in Sweden. Today's results are expedited assays from hole LAP21-05 located 40 metres along strike of hole LAP21-02 which intersected 3.19% Nickel over 4.25 metres (see news releases dated August 31 and September 15, 2021).
Drill Hole LAP21-05 Highlights:
  • 2.62% Ni over 5.65 metres within a 14.00 metre interval grading 1.40% Ni
  • Peak of 6.67% Ni over 0.65 metres
  • High-grade Nickel intercept less than 60 metres below surface
Results Table:
Hole ID From (m) To (m) Length (m) Ni % Cu % Co % PGEs (g/t)
LAP21-05 60.00 74.00 14.00 1.40 0.12 0.03 0.169
  62.35 68.00 5.65 2.62 0.13 0.05 0.177
  62.90 64.30 1.40 2.51 0.10 0.04 0.196
  65.10 68.00 2.90 3.39 0.14 0.06 0.212
  66.30 66.95 0.65 6.67 0.14 0.11 0.315
PGEs (g/t) = platinum (Pt) + palladium (Pd) + gold (Au)      
Length = core length in metres          
The high-grade nickel intercept in hole LAP21-05 consists of several sections of massive and semi-massive sulphides located at the upper contact of the host peridotite intrusion with the intercept located less than 60 metres below surface.
Hole LAP21-05 was drilled on Section 9E, 40 metres east of high-grade nickel mineralization recently intersected in hole LAP21-02 which drilled on Section 8E. LAP21-05 was one of three holes drilled on Section 9E testing a 90-metre interval up-dip of historic hole 2007-04 (0.97% Ni over 17.0 metres from 92.0 metres). Hole LAP21-05, along with LAP21-03 and LAP21-04 were all drilled at location 1,741,549mN and 7,165,169mE (RT90-2.5 co-ordinates) at an azimuth of 340 degrees. LAP21-05, a 100.3 metre hole, was drilled at a dip of -85 degrees, LAP21-04 was drilled 98 metres at a dip of -75 degrees, and LAP21-03 was drilled 77.5 metres at a dip of -45 degrees. Historic hole 74209 (2.87% Ni over 2.81 metres from 39.24 metres) is located between LAP21-03 and LAP21-04.
Drilling continues with tighter spaced holes at the shallow western part of the Lappvattnet deposit with a current plan of 15 drill holes covering a strike length of approximately 140 metres. Please link to accompanying attachment for plan map showing drill sections and a core photo of nickel mineralization in hole LAP21-05 (Figure 1).
Assays are pending for the lower portion of hole LAP21-05, as well as for holes LAP21-01, LAP21-03 to LAP21-06 and LAP21-08 to LAP21-10, all of which have been submitted to the lab. Drill core was logged and tagged for sampling at the Company's core logging facility in Lycksele then shipped to ALS Minerals' Core Services Laboratory in Mala. Core was sawed on site in Mala by ALS staff and prepped sample material was sent to ALS's Lab in Ireland. Core was analyzed for multi-elements using code ME-MS41, Cu OG46 analysis for >10000 ppm Cu, NiOG46 analysis for >10000 ppm Ni, and Pt, Pd, and Au were analyzed using fire assay method PGM-ICP27. Blanks and certified standards are routinely included in sample batches for quality assurance and control.
Gungnir's nickel resources in Sweden include Lappvattnet and Rormyrberget. In 2020, the Company updated both resources which collectively total 177 million pounds of nickel (see Technical Report with an effective date of November 17, 2020):
  • Lappvattnet: Inferred Resource of 780,000 tonnes grading 1.35% nickel for 23.1 million lbs (10.5 million kg) of nickel.
  • Rormyrberget: Inferred Resource of 36,800,000 tonnes grading 0.19% nickel for 154 million lbs (70 million kg) of nickel.
The technical information in this news release has been prepared and approved by Jari Paakki, P.Geo., CEO and a director of the Company. Mr. Paakki is a Qualified Person under National Instrument 43-101.
About Gungnir Resources
Gungnir Resources Inc. is a Canadian-based TSX-V listed mineral exploration company (GUG: TSX-V) with gold and base metal projects in northern Sweden. Gungnir's assets include the Knaften project which hosts a developing intrusion-hosted gold system, and VMS (zinc-copper) and copper-nickel targets, all of which are open for expansion and further discovery. East of Knaften, the Company holds two nickel-copper-cobalt deposits, Lappvattnet and Rormyrberget, with updated nickel resources. Further information about the Company and its properties may be found at www.gungnirresources.com or at www.sedar.com.
On behalf of the Board,
Jari Paakki, CEO and Director
For further information contact:
Head Office/Investor Relations
Phone: +1-604-683-0484
Jari Paakki, CEO
Email: jpaakki@eastlink.ca
Chris Robbins, CFO
Email: robbinscr@shaw.ca
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Forward-Looking Information
Certain statements in this news release may constitute "forward-looking information" within the meaning of applicable securities laws (also known as forward-looking statements). Forward-looking information involves known and unknown risks, uncertainties and other factors, and may cause actual results, performance or achievements or industry results, to be materially different from any future results, performance or achievements or industry results expressed or implied by such forward-looking information. Forward-looking information generally can be identified by the use of terms and phrases such as "anticipate", "believe", "could", "estimate", "expect", "feel", "intend", "may", "plan", "predict", "project", "subject to", "will", "would", and similar terms and phrases, including references to assumptions. Some of the specific forward-looking information in this news release includes, but is not limited to, statements with respect to: planned drilling activities and the expected timing thereof; expectations of additional high-grade nickel assays within the planned program, and Gungnir's plan for development of its properties and the timing thereof.
Forward-looking information is based on a number of key expectations and assumptions made by Gungnir, including, without limitation: the COVID-19 pandemic impact on the Canadian and global economy and Gungnir's business, and the extent and duration of such impact; no change to laws or regulations that negatively affect Gungnir's business; there will be a demand for Gungnir's services and products in the future; Gungnir will be able to operate its business as planned; and Gungnir's plans for future exploration and development of its properties is reasonable and will be possible within the anticipated timelines. Although the forward-looking information contained in this news release is based upon what Gungnir believes to be reasonable assumptions, it cannot assure investors that actual results will be consistent with such information.
Forward-looking information is provided for the purpose of presenting information about management's current expectations and plans relating to the future and readers are cautioned that such statements may not be appropriate for other purposes. Forward-looking information involves significant risks and uncertainties and should not be read as a guarantee of future performance or results as actual results may differ materially from those expressed or implied in such forward-looking information. Those risks and uncertainties include, among other things, risks related to: no certainty that any economically viable mineral deposit will be located on Gungnir's properties; that Gungnir may not be able to complete its planned drilling as anticipated; the impacts of the COVID-19 pandemic; ability to access capital markets; environmental matters; changes in legislation or regulations; receipt of required licenses, permits and approvals; and resource estimates may not be accurate and may differ significantly from actual mineral resources. Management believes that the expectations reflected in the forward-looking information contained herein are based upon reasonable assumptions and information currently available; however, management can give no assurance that actual results will be consistent with such forward-looking information. The forward-looking information contained this news release is expressly qualified in its entirety by this cautionary statement. Forward-looking information reflects management's current beliefs and is based on information currently available to Gungnir. The forward-looking information is stated as of the date of this news release and Gungnir assumes no obligation to update or revise such information to reflect new events or circumstances, except as may be required by applicable law.
SOURCE: Gungnir Resources Inc.

 


21.09.2021 Dissemination of a Corporate News, transmitted by DGAP - a service of EQS Group AG.
The issuer is solely responsible for the content of this announcement.

The DGAP Distribution Services include Regulatory Announcements, Financial/Corporate News and Press Releases.
Archive at www.dgap.de


Language: English
Company: Gungnir Resources Inc.
1688 152nd Street
V4A 4N2 Surrey, BC
Canada
Phone: +1-604-683-0484
Fax: +1-604-683-7497
Internet: www.gungnirresources.com
ISIN: CA40281L1094
WKN: A116WL
Listed: Regulated Unofficial Market in Frankfurt; Canadian Stock Exchange
EQS News ID: 1234759

 
End of News DGAP News Service

1234759  21.09.2021 

fncls.ssp?fn=show_t_gif&application_id=1234759&application_name=news&site_id=symex


Other stories

28/03/2024 18:00
28/03/2024 17:12
28/03/2024 13:40
28/03/2024 19:15
28/03/2024 15:31
28/03/2024 12:08
28/03/2024 19:27
28/03/2024 16:46
28/03/2024 10:29
28/03/2024 16:11
28/03/2024 17:33
28/03/2024 18:38
28/03/2024 09:33
28/03/2024 11:54
28/03/2024 19:49
28/03/2024 19:33
28/03/2024 17:38
28/03/2024 12:55
28/03/2024 10:49
27/03/2024 15:52
27/03/2024 19:23
28/03/2024 15:37
28/03/2024 18:47
28/03/2024 19:00
28/03/2024 13:11
28/03/2024 16:22
28/03/2024 15:27
28/03/2024 19:55
28/03/2024 19:35
28/03/2024 14:33
27/03/2024 11:10
28/03/2024 17:55
27/03/2024 21:46
27/03/2024 13:40
28/03/2024 13:25
27/03/2024 15:52
28/03/2024 12:57
28/03/2024 16:44